and have installed the pipe for the septic
but I wished they'd left the keys for the nice big tractor! I could have done some arena grading in the evening ;-) :-) !!!
Last night was probably the most uncomfortable for me so far ... the builders had disconnected most of the electrics in the house, so I was down to three power points and lots of extension leads. No power at all in the bathroom ... other than the lead coming in ... so I had a shower at night by lamp light - with the blow heater going. I had issues with trying to keep the heaters going and not short out the powerboards! Trying to run the necessities (fridge, heater and TV) was a bit of fun but I worked it out. Had to freeze whilst I plugged in the toaster!! Luckily - the most important things - hot water, electric blanket and fridge worked!
Apparently the ensuite should be complete mid-next week ... the tiler is the slowest part.
Tomorrow is a meeting of the architect, builder and I - lots of things on the agenda.